Packaging and printing
Job costing software for packaging and printing units
Substrate issued by reel, waste before the run settles, conversion steps after printing, and a client quoted per thousand. FleekERP issues substrate and ink by lot to the job, records setting and running waste separately at each operation, and closes the job with the cost that client actually incurred.
Book a demoBook a demo for your plant
45 minutes, run on your own stages and quality checks.
What slows packaging and print units down
- Make-ready waste hides in the totalSetting waste and running waste are counted together, so you can't tell whether the press or the operator is the problem.
- The wrong artwork reaches the pressRevisions are tracked by email, and an old version gets printed before anyone notices.
- Quoted cost and real cost differJobs are quoted per thousand, but substrate, ink and waste are never totalled per job to check the quote.
How it works
How your floor runs on FleekERP
- 1Job orderSales order with the artwork revision, substrate, quantity and dateProduction control
- 2PrepressPlate or cylinder set recorded against the job and its artwork revisionProduction planning
- 3SubstrateReels and sheets issued by lot, unused balance returned against the same lotInventory and traceability
- 4PrintingMakeready and running waste, counts and downtime per machineShop floor apps
- 5ConversionLamination, die cutting and pasting as operations with their own wasteProduction control
- 6Inspection and dispatchCheck against the approved sample, delivery note and invoiceQuality control
Built for packaging and print units
- Setting waste split from running wasteThe two are recorded as separate reasons, so a high setting loss on short runs shows up as itself instead of hiding in a total.
- Artwork revision on the jobThe job carries the revision it was approved against. A later revision does not change a job already running.
- Cost per clientSubstrate, ink, machine hours and job work roll up per job and per client, not only per month.
Proof from other floors
Measured on real floors
None of our live customers are packaging and print units yet. These factories are, and the same screens run your stages.
- Challenge
- OEM audit trails assembled from Excel, days per request
- Modules
- Production control, Traceability, Quality control
- Result
- Full lot trace in under 3 minutes. Excel traceability sheets gone.
- Challenge
- Planning took a full day; material over-consumption found after cutting
- Modules
- Production planning, Stock and BOM, Operator app
- Result
- Planning time down 60%. Over-consumption flagged while the roll is cut.
- Challenge
- Labour cost per order unknown; wages reconciled from bundle cards days later
- Modules
- Operator app, Production control, Cost per order
- Result
- Labour cost per order visible. Paper registers gone.
Cost and time
What it costs and how long it takes
- S$8per employee login a monthS$38 per user login, annual termSee pricing →
- S$6,400one-time setup, up to 100 loginsSetup and training at the stationHow setup works →
- 18 daysto your first production line liveOn scope agreed before you startWhat's included →
Questions from packaging and print units
Reels are issued and the balance comes back. Can stock handle that?
Yes. A reel is issued to the job by lot and the unused balance is returned against the same lot, so the reel's remaining length stays correct.
Can waste be recorded in sheets and in kilograms?
Waste is recorded in the unit the operation runs in. The item's conversion turns it into the unit the cost report uses.
Next step
See FleekERP on your own production flow
Bring your routings and quality checks. We set them up before the call, so the demo shows your own stages.