Garments and textiles
VSTAN Industries Pvt Ltd, Arani
Planning time down 60 percent. Fabric over-consumption flagged while the roll is cut.
Textile and garment manufacturer, three lines · Arani, Tamil Nadu
- Down 60%
- Production planning time
- Same day
- Fabric consumption against plan
- 18 days
- First line live
The challenge
What the floor looked like before
Style-wise production planning lived across a stack of spreadsheets, one per style, reconciled by hand before every planning meeting. Allocating orders to the right lines and sizes took hours, and the plan was out of date the moment a style changed. Fabric was issued against a cut plan worked out by hand, so over-consumption only surfaced at month-end stock reconciliation, long after the margin on that order was gone.
What was set up
On FleekERP
FleekERP replaced the spreadsheet stack with style-wise work orders linked to the cut plan. Orders are allocated to lines and sizes from one screen, and the plan updates as production is logged. Fabric is issued against the work order, and actual consumption is tracked per style as the roll is cut, with an over-consumption alert the moment a run drifts past its planned usage.
Results
What the customer reports
- Production planning time cut by about 60 percent, from hours of spreadsheet reconciliation to one screen.
- Fabric over-consumption flagged per style the same day, not at month-end reconciliation.
- Style-wise allocation across lines and sizes managed from one board instead of separate files.
- Planning meetings shortened, since the plan is current before the meeting starts.
- First line live in 18 days, with operators logging from their own Android phones.
“I thought my operators would never use a phone for this. Within a week the line counts were coming in on their own, and I stopped walking to the floor ten times a shift. Now I see all three lines from my phone, even sitting across from a buyer.”
Sector: Garments and textiles. Published March 2026.
More case studies
- Challenge
- OEM audit trails assembled from Excel, days per request
- Modules
- Production control, Traceability, Quality control
- Result
- Full lot trace in under 3 minutes. Excel traceability sheets gone.
- Challenge
- Night-shift shortfalls known at 8 am, buyer deadlines at risk
- Modules
- Production control, Operator and Supervisor apps
- Result
- Zero missed buyer deadlines since go-live. Hourly counts per line.
- Challenge
- Labour cost per order unknown; wages reconciled from bundle cards days later
- Modules
- Operator app, Production control, Cost per order
- Result
- Labour cost per order visible. Paper registers gone.
Next step
See results like these on your floor
Book a demo and we map FleekERP to your production flow, with your routings and quality checks set up on the call.