Case studies
Measured on real floors
4 factories live in Tamil Nadu and Karnataka. Each case study states the challenge, what was set up, and the result the customer reports. Nothing here is a projection.
SMX Enterprises
Electronics and wiring harness · Bengaluru
- Challenge
- OEM audit trails assembled from Excel, days per request
- Modules
- Production control, Traceability, Quality control
- Result
- Full lot trace in under 3 minutes. Excel traceability sheets gone.
VSTAN Industries
Garments and textiles · Arani
- Challenge
- Planning took a full day; material over-consumption found after cutting
- Modules
- Production planning, Stock and BOM, Operator app
- Result
- Planning time down 60%. Over-consumption flagged while the roll is cut.
VK Garments
Garments and textiles · Gudiyatham
- Challenge
- Night-shift shortfalls known at 8 am, buyer deadlines at risk
- Modules
- Production control, Operator and Supervisor apps
- Result
- Zero missed buyer deadlines since go-live. Hourly counts per line.
King Garments
Garments and textiles · Sivaganga
- Challenge
- Labour cost per order unknown; wages reconciled from bundle cards days later
- Modules
- Operator app, Production control, Cost per order
- Result
- Labour cost per order visible. Paper registers gone.
In their words
“I thought my operators would never use a phone for this. Within a week the line counts were coming in on their own, and I stopped walking to the floor ten times a shift. Now I see all three lines from my phone, even sitting across from a buyer.”
Next step
See FleekERP on your production flow
Bring your routings, quality checks and current accounting setup. Here is exactly what happens after you book.