The challenge
What the floor looked like before
SMX manufactures wiring harnesses and connectors for OEM customers who require batch traceability on every lot supplied. The traceability records lived in Excel, updated by hand, and were always a day or two behind production. When an OEM asked for a trace on a batch, which raw material lot, which production run, which operator, assembling the answer took hours of cross-referencing spreadsheets and registers, and the records were not always complete.
What was set up
On FleekERP
FleekERP was configured to SMX's wiring harness production flow. Component and wire lots are issued to the work order and recorded at each operation on the operators' phones. Lot genealogy builds as production happens. Every finished harness lot links back to the raw material lots, the production run and the operators who worked it. When an OEM requests a trace, the full genealogy is pulled from one search instead of reconstructed from spreadsheets.
Results
What the customer reports
- Full lot traceability pulled in under three minutes during an OEM customer audit, where it previously took hours.
- Every finished lot traceable to its source raw material lot and production run.
- Excel traceability sheets gone. Genealogy is built at the point of production.
- OEM traceability requests answered the same day instead of the next day.
- Incoming QC on vendor-supplied components logged against each lot, so the trace runs from supplier to shipment.
“Our OEM customers started asking for batch traceability on every wiring harness lot. FleekERP tracks every lot from wire cutting to final assembly. When our customer asked for a trace last month, we pulled it in under three minutes.”
Sector: Electronics and wiring harness. Published January 2026.
More case studies
- Challenge
- Planning took a full day; material over-consumption found after cutting
- Modules
- Production planning, Stock and BOM, Operator app
- Result
- Planning time down 60%. Over-consumption flagged while the roll is cut.
- Challenge
- Night-shift shortfalls known at 8 am, buyer deadlines at risk
- Modules
- Production control, Operator and Supervisor apps
- Result
- Zero missed buyer deadlines since go-live. Hourly counts per line.
- Challenge
- Labour cost per order unknown; wages reconciled from bundle cards days later
- Modules
- Operator app, Production control, Cost per order
- Result
- Labour cost per order visible. Paper registers gone.